Arcade Machine Import Process Guide: From Inquiry to After-Sales Support
The arcade machine import process is the sequence of steps a B2B buyer follows when ordering claw machines, prize machines, or other commercial arcade equipment from a manufacturer. It typically includes inquiry, quotation, specification confirmation, customization, deposit payment, production, quality control, balance payment, shipping, customs clearance, delivery, installation, and after-sales support. Understanding the full process helps buyers plan timelines, avoid misunderstandings, and reduce project risk.
This guide explains the main steps from a manufacturer's perspective.
Why Understanding the Import Process Matters
Arcade equipment orders involve production, customization, shipping, and installation. Each stage affects the next.
A clear process helps:
Set realistic timelines
Avoid specification errors
Confirm payment and shipping terms
Plan venue preparation
Reduce production delays
Prepare for installation and opening
Buyers who understand the process can communicate more efficiently with the supplier.
Step 1: Inquiry
The process starts with an inquiry.
Buyers should provide:
Destination country
Business type (arcade, FEC, distributor)
Equipment categories of interest
Estimated quantity
Budget range
Customization needs
Target opening date
Clear information helps the manufacturer respond with relevant recommendations.
Step 2: Quotation
The manufacturer prepares a quotation based on the inquiry.
The quotation may include:
Machine model
Specifications
Unit price
Quantity
Customization cost
Payment system
Packaging
Spare parts
Shipping terms
Lead time
Payment terms
Warranty
Buyers should confirm what is included and what is not.
Step 3: Specification Confirmation
Before production, specifications should be confirmed in writing.
Confirm:
Machine dimensions
Weight
Voltage
Frequency
Plug type
Payment system
Cabinet material
Display and lighting
Claw or game settings
Prize compatibility
Incorrect specifications can cause installation problems after delivery.
Step 4: Customization
If customization is required, details should be confirmed.
Customization may include:
Logo
Cabinet color
Artwork
Lighting
Payment system
Screen content
Cabinet design
Packaging
Buyers should provide clear files and review a mockup before production.
Step 5: Order Confirmation
The order is confirmed with a written document.
The order confirmation should include:
Machine model and quantity
Specifications
Customization details
Unit price and total price
Payment terms
Production time
Shipping terms
Packaging details
Warranty terms
Buyers should review the order confirmation carefully before paying the deposit.
Step 6: Deposit Payment
Production usually starts after the deposit is received.
Confirm:
Deposit amount
Payment method
Bank details
Production start date
Buyers should verify bank details through a reliable channel before transferring funds.
Step 7: Production
Production begins after the deposit and specification confirmation.
Production stages may include:
Material preparation
Cabinet production
Assembly
Wiring
Component installation
Software or setting configuration
Initial testing
Production time depends on machine type, quantity, and customization level.
Step 8: Quality Control
Quality control is performed before shipment.
Checks may include:
Appearance inspection
Electrical testing
Mechanical testing
Game function testing
Payment system testing
Packaging inspection
Buyers can request testing videos, production photos, and inspection reports.
Step 9: Balance Payment
The balance is usually paid before shipment or after inspection.
Confirm:
Balance amount
Payment timing
Inspection conditions
Shipping document release
Some buyers arrange third-party inspection before releasing the balance.
Step 10: Packaging
Machines are packed for export.
Packaging may include:
Wooden crates
Reinforced cartons
Foam and corner protection
Glass and acrylic protection
Moisture protection
Internal fixation
Packaging should match the machine type and shipping method.
Step 11: Shipping
Shipping is arranged based on the trade terms.
Shipping steps may include:
Booking freight
Container loading
Export clearance
Bill of lading
Transit to destination
Arrival at destination port
Buyers should confirm shipping documents and insurance.
Step 12: Customs Clearance
Customs clearance is handled at the destination.
Required documents may include:
Commercial invoice
Packing list
Bill of lading
Certificate of origin
Insurance documents
Customs declaration
Buyers should work with a customs broker familiar with arcade equipment imports.
Step 13: Delivery and Unloading
After customs release, the shipment is delivered to the venue.
Consider:
Delivery access
Unloading equipment
Machine placement
Packaging disposal
Damage inspection
Damage should be documented with photos and videos immediately.
Step 14: Installation and Testing
Machines are installed and tested before opening.
Testing may include:
Power and lighting
Controls and motors
Game functions
Payment systems
Prize mechanisms
Claw strength settings
Testing all machines before opening helps identify problems early.
Step 15: Staff Training
Staff should be trained before operation.
Training topics:
Machine operation
Prize refilling
Payment handling
Cleaning procedures
Basic troubleshooting
Safety procedures
Clear procedures reduce downtime and improve customer service.


